Industrial robot cell being relocated with crane rigging

Machinery Relocation Services with Full Recommissioning

Move Your Line.
Not Your Problems.

Machinery relocation services that go beyond rigging and trucking. We ensure your robot still hits positions, PLC still runs, and safety system still works in the new location. Engineering-led relocation with full recommissioning.

75+Lines Relocated
ZeroDamage Record
48-hrTypical Disconnect
100%Recommission Success

Common Pitfalls

Why Equipment Relocation Projects Fail

Documentation Gaps

Nobody documented which wire went where.

Mechanical Damage

"It worked before we moved it."

No Controls Expertise

Equipment installed but nothing communicates.

Timeline Surprises

"We thought it would take a weekend."

iAutomate eliminates these problems with engineering-led relocation services.

Why Us

Our Machinery Relocation Approach

Engineering-Led Relocation

Managed by controls engineers who understand robots, PLCs, and safety systems—not just riggers.

Documentation First

Complete I/O docs, robot backups, safety records BEFORE disconnect. Nothing is left to memory.

Recommissioning Included

We don't leave until you're running production. Recommissioning is part of every project.

Services

Machinery Relocation Services

01

De-Commissioning & Documentation

Complete documentation of every connection, backup of every program, controlled disconnect with labeling and transport preparation.

02

Layout Planning & Engineering

New facility layout analysis, utility planning, foundation requirements, and coordination with mechanical/electrical trades.

03

Industrial Rigging & Transport

Heavy equipment rigging, precision machinery handling, logistics coordination, and specialized transport for sensitive equipment.

04

Re-Installation & Reconnection

Mechanical anchoring, electrical reconnection, controls wiring, and pneumatic/hydraulic hookup—all to documentation.

05

Recommissioning & Validation

Robot re-mastering, PLC program verification, safety system validation, cycle time confirmation, and quality checks.

06

Post-Move Support

30-day support period included with every relocation. On-call engineers for any issues that arise after production restart.

Capabilities

Machinery & Equipment We Relocate

Robot Cell Relocation

Individual robot arms, complete welding cells, palletizing stations, and multi-robot assembly lines.

Production Line Relocation

Automotive assembly lines, packaging lines, conveyor systems, and paint lines.

CNC Machine Relocation

Machining centers, lathes, grinders, presses, and precision equipment requiring leveling.

Specialized Equipment Moving

Clean room equipment, semiconductor tools, battery manufacturing, and pharmaceutical machinery.

Process

Our Machinery Relocation Process

01

Assessment

2–4 weeks before

Site surveys, equipment inventory, risk assessment, and project planning.

02

Pre-Move Prep

1–2 weeks before

Documentation, program backups, labeling, and transport preparation.

03

De-Commission

Day 1–2

Controlled disconnect, component removal, and protective packaging.

04

Transport

Day 2–4

Rigging, loading, specialized transport, and delivery coordination.

05

Reconnection

Day 4–7

Mechanical install, electrical hookup, and controls wiring.

06

Recommissioning

Day 7–10

Robot mastering, PLC verification, safety validation, and cycle testing.

07

Handover

Day 10+

Production validation, operator sign-off, and 30-day support period begins.

Robot Cell Relocation Case Study

Multi-Robot Cell Relocation

6 FANUC welding robots · 200 miles · 2-week window

Challenge

Relocate a complete 6-robot FANUC welding cell 200 miles to a new facility within a 2-week shutdown window. JIT delivery requirements meant zero margin for delay.

Solution

Day 1–3De-commission & documentation
Day 4–6Transport (200 miles)
Day 7–10Reconnection & wiring
Day 11–13Recommissioning & testing
Day 14Validation & sign-off
Day 15Production restart ✓

Results

Timeline14 days14 days ✓
Robot Cal.<0.5mm0.2mm
Post-Move Issues<52 minor

FAQ

Machinery Relocation FAQ

It depends on scope. A single robot cell can be relocated in 5–7 days. A full production line typically takes 2–4 weeks. We provide a detailed timeline during the assessment phase.

Yes. We coordinate all rigging, crane work, and specialized transport. For oversized equipment, we arrange permits and escort vehicles as needed.

We carry full insurance for all relocations. Our engineering-led approach and documentation-first methodology means damage is extremely rare—we have a zero-damage record on robot relocations.

Yes. We've managed cross-border relocations between the US, Mexico, and Canada. We handle customs documentation, export compliance, and coordinate with local trades at the destination.

We handle all electrical, controls, pneumatic, and hydraulic disconnection and reconnection. For gas and specialized utilities, we coordinate with your facility team or licensed contractors.

We assess stored equipment before relocation. We'll identify any refurbishment needs, source replacement parts, and include recommissioning in the project plan.

Planning a Move?Planning a Move?

The earlier we're involved, the smoother your relocation.