Machinery Relocation Services with Full Recommissioning
Move Your Line.
Not Your Problems.
Machinery relocation services that go beyond rigging and trucking. We ensure your robot still hits positions, PLC still runs, and safety system still works in the new location. Engineering-led relocation with full recommissioning.
Common Pitfalls
Why Equipment Relocation Projects Fail
Documentation Gaps
Nobody documented which wire went where.
Mechanical Damage
"It worked before we moved it."
No Controls Expertise
Equipment installed but nothing communicates.
Timeline Surprises
"We thought it would take a weekend."
iAutomate eliminates these problems with engineering-led relocation services.
Why Us
Our Machinery Relocation Approach
Engineering-Led Relocation
Managed by controls engineers who understand robots, PLCs, and safety systems—not just riggers.
Documentation First
Complete I/O docs, robot backups, safety records BEFORE disconnect. Nothing is left to memory.
Recommissioning Included
We don't leave until you're running production. Recommissioning is part of every project.
Services
Machinery Relocation Services
De-Commissioning & Documentation
Complete documentation of every connection, backup of every program, controlled disconnect with labeling and transport preparation.
Layout Planning & Engineering
New facility layout analysis, utility planning, foundation requirements, and coordination with mechanical/electrical trades.
Industrial Rigging & Transport
Heavy equipment rigging, precision machinery handling, logistics coordination, and specialized transport for sensitive equipment.
Re-Installation & Reconnection
Mechanical anchoring, electrical reconnection, controls wiring, and pneumatic/hydraulic hookup—all to documentation.
Recommissioning & Validation
Robot re-mastering, PLC program verification, safety system validation, cycle time confirmation, and quality checks.
Post-Move Support
30-day support period included with every relocation. On-call engineers for any issues that arise after production restart.
Capabilities
Machinery & Equipment We Relocate
Robot Cell Relocation
Individual robot arms, complete welding cells, palletizing stations, and multi-robot assembly lines.
Production Line Relocation
Automotive assembly lines, packaging lines, conveyor systems, and paint lines.
CNC Machine Relocation
Machining centers, lathes, grinders, presses, and precision equipment requiring leveling.
Specialized Equipment Moving
Clean room equipment, semiconductor tools, battery manufacturing, and pharmaceutical machinery.
Process
Our Machinery Relocation Process
Assessment
2–4 weeks beforeSite surveys, equipment inventory, risk assessment, and project planning.
Pre-Move Prep
1–2 weeks beforeDocumentation, program backups, labeling, and transport preparation.
De-Commission
Day 1–2Controlled disconnect, component removal, and protective packaging.
Transport
Day 2–4Rigging, loading, specialized transport, and delivery coordination.
Reconnection
Day 4–7Mechanical install, electrical hookup, and controls wiring.
Recommissioning
Day 7–10Robot mastering, PLC verification, safety validation, and cycle testing.
Handover
Day 10+Production validation, operator sign-off, and 30-day support period begins.
Assessment
2–4 weeks beforeSite surveys, equipment inventory, risk assessment, and project planning.
Pre-Move Prep
1–2 weeks beforeDocumentation, program backups, labeling, and transport preparation.
De-Commission
Day 1–2Controlled disconnect, component removal, and protective packaging.
Transport
Day 2–4Rigging, loading, specialized transport, and delivery coordination.
Reconnection
Day 4–7Mechanical install, electrical hookup, and controls wiring.
Recommissioning
Day 7–10Robot mastering, PLC verification, safety validation, and cycle testing.
Handover
Day 10+Production validation, operator sign-off, and 30-day support period begins.
Robot Cell Relocation Case Study
Multi-Robot Cell Relocation
6 FANUC welding robots · 200 miles · 2-week window
Challenge
Relocate a complete 6-robot FANUC welding cell 200 miles to a new facility within a 2-week shutdown window. JIT delivery requirements meant zero margin for delay.
Solution
Results
FAQ
Machinery Relocation FAQ
It depends on scope. A single robot cell can be relocated in 5–7 days. A full production line typically takes 2–4 weeks. We provide a detailed timeline during the assessment phase.
Yes. We coordinate all rigging, crane work, and specialized transport. For oversized equipment, we arrange permits and escort vehicles as needed.
We carry full insurance for all relocations. Our engineering-led approach and documentation-first methodology means damage is extremely rare—we have a zero-damage record on robot relocations.
Yes. We've managed cross-border relocations between the US, Mexico, and Canada. We handle customs documentation, export compliance, and coordinate with local trades at the destination.
We handle all electrical, controls, pneumatic, and hydraulic disconnection and reconnection. For gas and specialized utilities, we coordinate with your facility team or licensed contractors.
We assess stored equipment before relocation. We'll identify any refurbishment needs, source replacement parts, and include recommissioning in the project plan.
Planning a Move?Planning a Move?
The earlier we're involved, the smoother your relocation.