Heavy Machinery Rigging
Presses, CNC, injection molders, transformers. From 5 t skates to 350 t crane lifts.


重型设备搬得动。
落位要精准。
为关键设备提供吊装与工厂搬迁,覆盖工程方案、跨境运输与复位爬坡。
当200吨设备需在不停产条件下位移时,需要工程级执行能力。
Presses, CNC, injection molders, transformers. From 5 t skates to 350 t crane lifts.
Full-line teardown, transport and reinstall. Domestic and cross-border (USA · MX · CA).
Engineered lift plans, load charts, ground bearing studies, signed Job Safety Analysis.
Air casters, hydraulic skates, climbing jacks. Tight clearances and active production floors.
Pad design, isolation grouting, chemical anchors, leveling and final alignment to spec.
Mechanical reassembly, utilities reconnection, controls re-link and ramp-up to production.
Hydraulic truck cranes, all-terrain and crawler cranes for outdoor lifts and steel erection.
Grove GMK · Liebherr LTM · Tadano GR
Liebherr LTM 1100 · Grove GMK6300L-1
Manitowoc · Liebherr LR · Kobelco CK
A 150-tonne lift is a plan before it's a movement. Crane positioning, rigging geometry, load radius, ground bearing pressure and a dedicated swing zone — all signed off before a hook leaves the ground.
On-site survey, route mapping, ground bearing analysis, engineered lift plan and signed JSA before any rigging touches the floor.
Crane lifts, gantry lifts, jacking and skating. From single-cell moves to full plant teardowns.
Permitted over-dimensional transport. Route surveys, escort cars, cross-border (USA · MX · CA) coordination.
Pad prep, anchor design, isolation grouting, laser leveling and final alignment to OEM spec.
Reconnect utilities, mechanical reassembly, electrical re-termination and controls commissioning.
$5 M general liability + cargo + rigger's. Engineered plans, signed JSAs, full pre-move risk register.
On-site walk-through. We map dimensions, doorways, floor loads, route constraints and utility tie-ins.
Engineered lift plan, ground bearing study, route survey, fixed pricing and milestone schedule.
Job Safety Analysis, DOT permits, pilot car coordination, COI distribution and pre-job meeting.
Disconnect, rig, lift, transport, set and align. Continuous photo log and daily progress reports.
Foundation, leveling, utilities, controls re-link, ramp-up and signed Site Acceptance Test.
A 220-tonne mechanical stamping press needed to shift 18 inches to make room for an adjacent line expansion. Constraint: maintain weekend production on the same press.
"Monday morning the press ran first part — same shot weight, same dimensions. We didn't lose a single shift."
我们可执行高吨位设备迁移,并提供完整工程吊装方案与风险控制。
支持,含许可、运输与跨境执行协调。
按项目提供责任险、货运险与吊装相关保险文件。
多数场景可通过分阶段窗口化执行降低停线影响。
由具备资质人员签署,必要时由专业工程师签发。
提供全流程,从拆除到复位、联调与产能恢复。
Single press, full plant or cross-border to Mexico — let's plan the move. Site survey within 5 business days.