iAutomate
947-201-6584
ZH · i18n
首页/服务/吊装与搬迁
DOC · SVC-RIG-001在线
/SVC-04吊装 · 重载运输 · 复位

面向产线支持的吊装与搬迁服务

重型设备搬得动。
落位要精准。

为关键设备提供吊装与工厂搬迁,覆盖工程方案、跨境运输与复位爬坡。

当200吨设备需在不停产条件下位移时,需要工程级执行能力。

吊装团队数据表REV B.3
1,200+
台设备搬迁
350t
最大起吊能力
0
可记录事故
24/7
危机响应
DOCSVC-RIG-001
COVERAGEUSA-MX-CA
STDASME B30
SLA24/7
/ 数据表
Status: 已发布 · 可执行
标准ASME B30 / OSHA 1926
起吊能力最高 350t
覆盖USA-MX-CA
调度24/7
/ ENGINEERING EVIDENCE
/01能力

Rigging and Relocation Capabilities
for Production Line Moves

06 capabilities · CAP-01 → CAP-06
/CAP-01

Heavy Machinery Rigging

Presses, CNC, injection molders, transformers. From 5 t skates to 350 t crane lifts.

范围5 t → 350 t
/CAP-02

Plant Relocation

Full-line teardown, transport and reinstall. Domestic and cross-border (USA · MX · CA).

范围Single cell → full plant
/CAP-03

Lift Engineering & JSA

Engineered lift plans, load charts, ground bearing studies, signed Job Safety Analysis.

范围ASME B30 · OSHA 1926
/CAP-04

Machinery Skating & Jacking

Air casters, hydraulic skates, climbing jacks. Tight clearances and active production floors.

范围≤ 25 mm clearance
/CAP-05

Foundation & Anchoring

Pad design, isolation grouting, chemical anchors, leveling and final alignment to spec.

范围Laser-leveled · ±0.05 mm/m
/CAP-06

Reinstall & Recommission

Mechanical reassembly, utilities reconnection, controls re-link and ramp-up to production.

范围Mech + elec + ctrl
/02设备 · 数据表

Rigging Equipment for Heavy Machinery
and Production Line Relocation

05 equipment classes · EQP/01 → EQP/05
EQP/01Multi-vendor
Engineered & inspected

Mobile & Crawler Cranes

Hydraulic truck cranes, all-terrain and crawler cranes for outdoor lifts and steel erection.

Capacity
30 t → 350 t
Reach
Up to 90 m
Certifications & Standards
NCCCO certified operatorsASME B30.5 inspectionsEngineered lift plans
Request Cranes
/CLS-01Hydraulic Truck

Grove GMK · Liebherr LTM · Tadano GR

/CLS-02All-Terrain

Liebherr LTM 1100 · Grove GMK6300L-1

/CLS-03Crawler

Manitowoc · Liebherr LR · Kobelco CK

/03参考吊装方案

Engineered Lift Planning
for Safe Machinery Relocation

A 150-tonne lift is a plan before it's a movement. Crane positioning, rigging geometry, load radius, ground bearing pressure and a dedicated swing zone — all signed off before a hook leaves the ground.

  • P1Crane spot · Outrigger pads
  • P2Load radius · Boom angle
  • P3Rigging geometry · Slings & shackles
  • P4Swing zone · Tag-line stations
  • P5Set point · Receiving foundation
DWG · LIFT-RIG-001视图 · 顶视
场地区域 · 受控区域 50 FTABC123NSETPADP5 · 150 t就位标高 ±2 mm吊车350 tP1 · SPOTP2 · 载荷半径 65 FT · 78°半径校核线吊钩P4 · 回转区域隔离线 · 禁止人员进入TAG-ATAG-B地面承载 · 最大 4,500 PSF · 需铺垫吊装方案由指挥 + PE 复核
图例: 橙色 = 吊装关键几何图例: 白色 = 场地与流程参考REV · L3SCALE · NTS · ISSUED 2026-04-26
/04吊装与搬迁服务目录

Survey, lift, transport,
land it back online.

06 lines · SVC-01 → SVC-06
/SVC-01

现场勘查与吊装工程

On-site survey, route mapping, ground bearing analysis, engineered lift plan and signed JSA before any rigging touches the floor.

SurveyEngineeredPE-Signed
交付物Lift plan + JSA
/SVC-02

重型吊装与搬运

Crane lifts, gantry lifts, jacking and skating. From single-cell moves to full plant teardowns.

NCCCOASME B30OSHA 1926
交付物Move log + photos
/SVC-03

重载运输

Permitted over-dimensional transport. Route surveys, escort cars, cross-border (USA · MX · CA) coordination.

DOTCross-borderPermitted
交付物BOL + permits
/SVC-04

基础与复位安装

Pad prep, anchor design, isolation grouting, laser leveling and final alignment to OEM spec.

Laser±0.05 mm/mOEM-spec
交付物Alignment report
/SVC-05

机械与控制重联

Reconnect utilities, mechanical reassembly, electrical re-termination and controls commissioning.

MechElecControls
交付物Recommission file
/SVC-06

保险与风险管理

$5 M general liability + cargo + rigger's. Engineered plans, signed JSAs, full pre-move risk register.

$5M GLCargoRigger's
交付物COI + risk file
/05项目阶段

Rigging and Relocation
Delivery Process

T+001/05

现场勘查

Same week

On-site walk-through. We map dimensions, doorways, floor loads, route constraints and utility tie-ins.

交付物
DOC-01 · Site Brief
T+5d02/05

吊装方案与报价

5–10 days

Engineered lift plan, ground bearing study, route survey, fixed pricing and milestone schedule.

交付物
DOC-02 · Lift Plan
T+jsa03/05

JSA 与许可

1–2 wks

Job Safety Analysis, DOT permits, pilot car coordination, COI distribution and pre-job meeting.

交付物
DOC-03 · JSA + Permits
T+move04/05

执行搬迁

Per scope

Disconnect, rig, lift, transport, set and align. Continuous photo log and daily progress reports.

交付物
DOC-04 · Move Log
T+SAT05/05

复位安装与 SAT

On-site

Foundation, leveling, utilities, controls re-link, ramp-up and signed Site Acceptance Test.

交付物
DOC-05 · SAT + Photos
/06现场报告
CASE · CS-RIG-022 · Stamping Plant · 220 t Press Relocation

Production Line Relocation Case Study
with Zero Downtime Loss

A 220-tonne mechanical stamping press needed to shift 18 inches to make room for an adjacent line expansion. Constraint: maintain weekend production on the same press.

MethodHydraulic skates · climbing jacks
WindowFriday 18:00 → Sunday 22:00
Crew8 riggers · 1 PE · 1 lift director
Re-alignLaser-leveled · ±0.05 mm/m
"Monday morning the press ran first part — same shot weight, same dimensions. We didn't lose a single shift."
— Plant Manager, Tier-1 Auto Stamping
/ 实测结果SAT后 · 30天
生产损失−100%
预计 ≥1 班次损失 0 班次
最终对中提升 2.5×
规格 ±0.1 mm/m±0.04 mm/m
窗口占用−10%
计划 52 h执行 47 h
可记录事故−100%
行业均值 1.20
规划搬迁
/07吊装与搬迁 FAQ

问题,直接回答。

我们可执行高吨位设备迁移,并提供完整工程吊装方案与风险控制。

支持,含许可、运输与跨境执行协调。

按项目提供责任险、货运险与吊装相关保险文件。

多数场景可通过分阶段窗口化执行降低停线影响。

由具备资质人员签署,必要时由专业工程师签发。

提供全流程,从拆除到复位、联调与产能恢复。

/08联系

Talk to a Rigging and
Relocation Engineer

Single press, full plant or cross-border to Mexico — let's plan the move. Site survey within 5 business days.

/ 服务窗口
  • 现场勘查≤ 5 个工作日
  • 危机响应24 / 7 / 365
  • 覆盖范围USA · MX · CA
  • 保险$5M GL + Cargo