iAutomate
947-201-6584
ZH · i18n
LIVE
--:--:-- UTC
/IND-AERO航空航天 · AS9100

航空航天自动化
按千分位精度执行。

我们交付符合AS9100的自动化单元,满足精度、追溯与审计记录要求,支撑受监管生产。

/DATASHEETREF. IND-AERO-001
工艺钻孔 · 紧固 · 检测 · 总装
公差按工艺能力目标控制
机器人FANUC · ABB · KUKA
安全ISO 10218 · ISO 13849
质量AS9100 · Nadcap 对齐
数据序列级追溯 + MES/QMS
85+
航空航天单元
12
覆盖国家
0
关键逃逸
Cpk
能力优先

答案优先

航空航天自动化应如何优先排序?

优先解决最高风险质量瓶颈:关键孔位公差、紧固波动、检验漏检与数字追溯缺口。

What does aerospace automation include in practice?

It includes precision machining support, robotic positioning, in-line inspection integration, and controls architecture that preserves audit-ready operation records.

How do aerospace teams estimate ROI before deployment?

ROI is usually modeled from rework reduction, cycle-time gains, quality stability, and improved first-pass acceptance using baseline metrics from current production.

Can aerospace cells integrate with existing MES and quality systems?

Yes. Most projects integrate with existing MES and quality environments for traceability, inspection history, and controlled handover documentation.

How quickly can support start for release-blocking issues?

Support can begin quickly with remote diagnostics and then shift to targeted on-site execution for production constraints affecting quality or schedule.

Teams planning aerospace automation typically compare traceability depth, quality-system alignment, and support coverage before selecting aerospace automation companies for long lifecycle programs.

Industry references: IAQG / AS9100 · EASA · FAA · NADCAP
/01QUALITY FRAMEWORK

Aerospace automation standards matrix.

Aerospace cells aren't certified by accident. Every iAutomate deployment is built against this matrix from URS forward.

/QMS-01

AS9100 Rev D

航空航天 QMS layered on ISO 9001 — risk, configuration, FOD.

  • Risk-based thinking
  • Configuration mgmt
  • FOD prevention
  • Counterfeit parts control
/QMS-02

NADCAP Special Processes

Heat treat, NDT, chem-process and welding accreditation paths.

  • AC7114 NDT
  • AC7110 welding
  • AC7108 chem-process
  • Audit-ready records
/QMS-03

FAA / EASA

Civil airworthiness regulator compliance for production.

  • PMA / TSO support
  • 21G production org
  • DER / DAR coordination
  • Continued airworthiness
/QMS-04

Boeing D6-83439

Boeing supplier 质量 requirements and flowdown.

  • FOD program
  • Stamp control
  • Sub-tier flowdown
  • Source inspection
/QMS-05

Airbus AIMS / EN 9100

Airbus material and 质量 standards.

  • AIMS material specs
  • EN 9100 alignment
  • ProSupplier reporting
  • Concession process
/QMS-06

AS9102 First Article

First Article Inspection Reports for new and changed parts.

  • Form 1 / 2 / 3
  • Bubbled drawings
  • Material certs traced
  • Delta FAI on change
/02PLATFORM DATASHEET

Five aerospace automation subsystems.

Vendor-agnostic engineering across the platforms aerospace OEMs and Tier 1s already standardize on.

/DRL · HOLES, COUNTERSINKS, FASTENERS

Automated Drilling & Fastening

Holes, countersinks, fasteners. Engineered for AS9100 Rev D environments with full configuration control and audit trail.

SPECIFICATIONREF · DRL-2026
POSITION±0.001″ at TCP
DRILL HEADServo z-axis + thrust loop
MATERIALSAl 7075 · Ti-6Al-4V · CFRP stack
FASTENERSHiLok · Lockbolt · interference fit
RECORDSPer-hole load + depth log
/03REFERENCE CELL

Drill-and-fasten cell — top view.

Schematic of a representative AS9100 aerospace drilling cell with secondary guide rail, laser tracker positioning and integrated NDT station.

SCHEMATIC · SCALE 1:50 · REF DWG-AE-001
ISO 10218 SAFETY PERIMETERAEROSTRUCTURE — PN 7472SECONDARY LINEAR GUIDE RAIL · 8 mROBOT R1/R1DRILL HEAD/DHROBOT R2/R2LASER TRACKER/LTNDTPAUT · ET/NDTMES · SOLUMINA / APRISO/MES — PER-HOLE TRACEABILITY
/LTLaser tracker (positioning)
/R1/R2Precision robot cells
/DHServo drill head
/NDTPhased-array UT + ET
/04APPLICATIONS

Aerospace automation applications by process stage.

/APP-01

钻孔与紧固

Hi-Lok, lockbolt, interference fit on Al/Ti/CFRP stacks.

/APP-02

Aerostructure Assembly

Wing, fuselage, empennage positioning and joining.

/APP-03

NDT & Dimensional

PAUT, eddy current, CMM and laser scan inspection.

/APP-04

Composite Layup Support

Ply placement assist, sealant dispense, bagging aids.

/APP-05

Robotic Surface Treatment

Sanding, sealing, painting and coating in Class-A booths.

/APP-06

MRO Automation

Borescope, repair guidance and documented overhaul.

/05ENGINEERING LIFECYCLE

From URS to source inspection.

Five gates. Each gate produces a controlled deliverable signed under aerospace configuration management.

01T+0
/DISCOVERY

URS & FAI Strategy

DELIVERABLE
DOC-01 URS + AS9102 plan
02T+3W
/DESIGN

Cell Layout & Tolerance Stack

DELIVERABLE
DOC-02 GD&T study + layout
03T+10W
/BUILD

FAT + NADCAP Pre-audit

DELIVERABLE
DOC-03 FAT + special process pkg
04T+14W
/QUALIFY

First Article Inspection

DELIVERABLE
DOC-04 AS9102 Form 1/2/3
05T+SAT
/RELEASE

Source Inspection & Handover

DELIVERABLE
DOC-05 PPAP-style release pkg
/06FIELD REPORT

Aerostructure drilling cell — Tier 1 supplier.

Eight-meter robotic drilling and fastening cell with laser-tracker positioning, delivering aerospace-grade tolerances on first article submission.

  • 机器人钻铆单元按公差稳定运行
  • 激光跟踪补偿与在线计量闭环
  • 安全联锁与功能验证完整
  • 工序级序列化追溯记录
  • 交付 QA 与生产放行包
START YOUR AEROSPACE PROJECT →
/RESULTSDOC · CASE-AE-007
METRICBEFOREAFTER
一次通过率92.8%99.3%
节拍100%79%(-21%)
报废基线-63%

"iAutomate delivered precision automation that exceeded our specifications."

— MFG. ENGINEERING MANAGER
/08常见问题

航空航天常见问题。

支持,提供受控交付件、追溯与审计证据。

可以,支持视觉、计量与 NDT 的质量联锁集成。

可以,在不中断产线目标下完成控制升级与优化。

支持 AB、Siemens 等,按客户标准实施。

通过工序级序列数据采集并同步 MES/QMS。

/CTA下一步

Ready for precision
aerospace automation?

AS9100-aligned cells from URS to source inspection. Talk to an aerospace engineer this week and define the right roadmap for precision aerospace automation. For adjacent high-precision workflows, review our electronics automation programs and manufacturing automation services.